These Thames Water sewage works are overflowing with demand
A new interactive map has been published, with some sites functioning at less than 60% of required capacity Analysts from the volunteer-led Oxford Rivers Improvement Campaign [ORIC] conducted on-the-ground research which revealed the extent of the shortcomings. Of the locations which are underperforming, 94 are operating between 80 and 100% capacity, and 70 between 60 … Continue reading These Thames Water sewage works are overflowing with demand
Copy and paste this URL into your WordPress site to embed
Copy and paste this code into your site to embed