These Thames Water sewage works are overflowing with demand

A new interactive map has been published, with some sites functioning at less than 60% of required capacity  Analysts from the volunteer-led Oxford Rivers Improvement Campaign [ORIC] conducted on-the-ground research which revealed the extent of the shortcomings.  Of the locations which are underperforming, 94 are operating between 80 and 100% capacity, and 70 between 60 … Continue reading These Thames Water sewage works are overflowing with demand